| Location | Osborne Middle, GA |
| Industry | Education |
| Company Size | 10,000 employees or more |
| Website | http://www.gcpsjobs.org |
Para AUT-Resource-Level IV - Special Education JobID: 102773
Position Type:
Paraprofessionals/Para AUT-Resource-Level IV
Date Posted:
5/21/2026
Location:
Osborne Middle
Job Code: Para AUT-Resource-Level IV - 050077 Standard Hours: 40 Department: Special Education - 101200 Empl Class: NA Minimum Salary: $26,534.00/Annually
Maximum Salary: $42,355.00/Annually
Scheduled Days: 190
Target Openings: 1
  Job Description: Show/Hide
License and Certification Qualifications:
Education Qualifications:
Experience Qualifications:
Skills Qualifications:
Primary Responsibilities:
Provide support to the instructional program within an assigned classroom with specific responsibility for assisting in the supervision, care, and instruction of special needs students in the regular education classroom, special education classroom, community, and assisting in implementing plans for instruction, monitoring student behavior during non-classroom time, providing information to appropriate school personnel, and attending Individual Education Program (IEP) meetings.
Physical Demands:
While performing the duties of this job, the employee is required to stand, walk, negotiate stairs, climb ladders, reach with hands and arms, talk, and hear, manipulate tools and small items with hands, and lift and transport up to 50 pounds over short distances. The employee is required to operate a motor vehicle in performance of duties. Specific vision abilities required by this job include close vision, distance vision, and color vision. The employee may be subjected to a wide range of ambient temperature and humidity conditions while working on equipment under varying conditions including overhead work and work in confined spaces. Potential hazards of this position include working with electricity, working with heat and noise producing machinery and equipment, working on elevated equipment using ladders or other lifting devices, and use of chemicals and solvents. Reasonable accommodations will be made for individuals with specific disabilities.
Gwinnett County Public Schools is a high achieving, honored school system, located in the metro Atlanta area. GCPS is the largest school system in Georgia with more than 180,000 students and continuing to grow. That growth can be attributed to the fact that Gwinnett is a school system of choice for people moving to the Atlanta area. Gwinnett County citizens highly value the important role education plays in building a thriving, global community and they strongly support the school system’s pursuit of excellence. Gwinnett County Public Schools is a three-time finalist for the Broad Prize of Urban Education (2009, 2010 & 2014) and 2 time winner of the 2010 and 2014 Broad Prize, designating it as one of the nation’s top urban school districts. GCPS was voted a Forbes Magazine Top Employer and a 3- time Top Employer for Women. Gwinnett also boasts National Blue Ribbon Schools and a host of schools recognized at the state level.