Review on topside engineering sub-contractor deliverables (MDS, Specification, TBE Report, POQR, TQ, inter-disciplines documents related to packages) with reference to project specification. Participates in bids clarification meeting, kick off meeting, design reviews, technical safety studies workshop, model reviews for packages.