Sr. Construction Scheduler - Dallas, TX

  • Full-time

Highlights

This role is responsible for developing and maintaining resource- and cost-loaded P6 schedules, performing critical path analysis, forecasting schedule impacts, and partnering closely with project teams to drive successful project execution from planning through completion. The QISG team brings together Engineering, Safety, Quality, Material Procurement, QA/QC, Right-of-Way Acquisition, Scheduling, Environmental Planning, Permitting, Title and Land Management expertise that ensure outstanding results for our clients.

Numbers & Facts

LocationDallas, Texas
Job TypeFull-time

Description

About Us:

QISG leverages Quanta’s comprehensive resources to deliver collaborative solutions for our partners' energy infrastructure needs. We use in-house talent, expertise and resources to plan, design, engineer, manage, conduct maintenance on and construct projects.


Our turnkey service capabilities provide our customers with efficiency, consistency, attention to detail and safe execution. The QISG team brings together Engineering, Safety, Quality, Material Procurement, QA/QC, Right-of-Way Acquisition, Scheduling, Environmental Planning, Permitting, Title and Land Management expertise that ensure outstanding results for our clients.

About this Role:

Senior Scheduler 

 

Location: Dallas, TX 
Travel Requirement: Up to 30% (domestic)

QISG is seeking an experienced Primavera P6 Scheduler to support utility Transmission & Distribution (T-Line) and Substation EPC projects. This role is responsible for developing and maintaining resource- and cost-loaded P6 schedules, performing critical path analysis, forecasting schedule impacts, and partnering closely with project teams to drive successful project execution from planning through completion.

What You'll Do:
  • Develop and manage LSM and CPM Primavera P6 schedules for utility transmission, substation, and renewable projects
  • Build and maintain resource- and cost-loaded schedules aligned with baselines and execution strategies
  • Integrate inputs from engineering, procurement, construction, and commissioning teams
  • Perform critical path analysis, what-if scenarios, and productivity tracking
  • Identify schedule risks, evaluate sequencing, and recommend mitigation strategies
  • Produce earned value metrics, KPIs, and cash flow reports for project controls and executives
  • Support look-ahead planning, short-interval schedules, and continuous improvement
  • Maintain compliant schedule documentation per contract and company standards
What You'll Bring:
  • 5+ years of scheduling experience in EPC, utility, transmission & distribution (T&D), substations, or large-scale infrastructure projects.
  • Utility T-Line and substation scheduling experience highly preferred.
  • Advanced Primavera P6 expertise, including developing and managing cost- and resource-loaded schedules.
  • Experience with Linear Scheduling, large-scale sitework, and long-lead equipment planning is a plus.
  • Familiarity with TILOS, Deltek Acumen Fuse/Risk, or similar schedule analysis tools preferred.
  • Proven ability to work with Engineering, Permitting, Procurement, Construction, and Commissioning teams to develop and maintain integrated schedules.
  • Strong communication and influencing skills, with the ability to coordinate across multiple teams and stakeholders.
  • Highly organized and self-motivated, with the ability to manage multiple priorities in a fast-paced EPC environment.
  • High school diploma required; Bachelor’s degree in Engineering, Construction Management, Business, or a related field preferred.
What You'll Get:
  • Competitive base salary

  • Generous PTO & paid holidays to maintain work-life balance

  • 401(k) with a generous match to plan for your future

  • Comprehensive benefits – medical, dental, vision, and life insurance

  • Weekly pay for consistent, reliable compensation

  • Great mentoring & career growth opportunities – we invest in your development

    #LI-SM1 

Equal Opportunity Employer:

All qualified applicants will receive consideration for employment and will not be discriminated against on the basis of race, color, religion, national origin or ancestry, sex (including gender, pregnancy, sexual orientation, and/or gender identity), age, disability, genetic information, veteran status, and/or any other basis protected by applicable federal, state or local law.

We are an Equal Opportunity Employer, including disability and protected veteran status.

We prohibit all types of discrimination and are committed to providing access and equal opportunity for individuals with disabilities. For additional information or if reasonable accommodation is needed to participate in the job application, interview, or hiring processes or to perform the essential functions of a position, please contact us the Company’s Human Resources department.

Similar Jobs

Jobot

Scheduler

  • Dallas, TX
4 days ago
See more jobs