| Location | Irvine, CA |
| Job Type | Full-time |
| Industry | Electronics, Components, and Semiconductor Mfg |
| Company Size | 50 to 99 employees |
| Year Founded | 1984 |
| Website | http://www.fsttechnical.com |
Lead the Systems That Power Critical Infrastructure
At FST Technical Services, we ensure the most complex facilities in the world perform exactly as designed. From data centers to advanced manufacturing environments, our work sits at the intersection of engineering precision and real-world execution.
We are looking for a Senior Electrical Commissioning Project Engineer who can lead from the front, solve complex technical challenges, and drive commissioning outcomes in high-stakes environments.
Why This Role Stands Out
This is not a checklist-driven commissioning role.
This is a position for someone who:
• Owns outcomes, not just tasks
• Understands systems holistically, not in silos
• Can operate independently while leading others
You will play a direct role in ensuring critical systems are designed correctly, installed properly, and perform under real-world conditions.
What You’ll Do
Project Leadership & Execution
• Lead commissioning activities across the full project lifecycle
• Execute and oversee functional testing, factory witness testing, and on-site validation
• Manage multiple assignments while maintaining schedule, budget, and quality expectations
• Interpret contract documents to identify risks and opportunities
Technical Expertise & Problem Solving
• Evaluate electrical distribution systems and building system interconnectivity
• Troubleshoot system performance issues in real time
• Review design documentation and submittals
Client & Stakeholder Engagement
• Lead commissioning meetings and communicate findings
• Serve as a trusted partner to clients and contractors
Operational Contributions
• Complete field reports, documentation, and time management
• Support scheduling and revenue targets
Team Development
• Mentor junior engineers and support training initiatives
What You Bring
Core Qualifications
• Electrical Engineering degree or Qualified Electrician background
• 7+ years in electrical systems OR 3+ years commissioning
• Data center or mission-critical experience
Technical Capabilities
• Experience with electrical distribution, HVAC systems, controls, fire alarm, and automation
• Ability to read construction drawings and specifications
Professional Skills
• Strong analytical and communication skills
• Ability to lead meetings and manage multiple priorities
Physical Requirements
• Ability to work in field environments, climb ladders, and lift ~30 lbs
Preferred
• EIT, CEM, LEED, OSHA 30, BIM experience
Travel Requirements
Regular travel to project sites with potential for broader U.S. travel. Must be able to work on-site as required.
Why FST
At FST, you are part of a team that values execution, accountability, and expertise. Strong performers are recognized, and engineers have opportunities to grow into leadership roles
Salary range: $130,000 to $180,000
Powered by JazzHR
FST Technical Services was founded in 1984 to serve the needs of the growing, worldwide Semiconductor/Microelectronics and Life Sciences industries. We began as an independent interface between our clients and their subcontractors to establish build clean installation methods that satisfied internal specifications and conformed to regulatory requirements.
FST’s core expertise is in developing technical and logistical solutions for complex needs by continually investing in the most advanced equipment and training to meet the needs of the rapidly changing markets it serves. Today, our business has expanded to additional markets, including Automation, Manufacturing, Data/IT Centers, Energy/Advanced Technology and Technology/Research Laboratories.
Our experienced FST team serves as your trusted partner for QA/QC Services, Equipment Services, Staffing Solutions, Project Management, Analytical Testing and Inspections – virtually anything you might need throughout your project lifecycle. FST professionals also provide project consultation and employee training. We guide our customers throughout each project phase to ensure full compliance.
With peerless performance and proven results, FST is with you all the way.