Product Support Specialist - Relocate to Warroad, MN Marvin
- $22–$26 Per Hour
| Location | Texas |
Vantage Trades Group LLC is seeking a highly experienced Senior Safety Professional / Lift Director to support a large-scale data center construction project. This is a specialized field safety position requiring an experienced construction safety professional with extensive hands-on knowledge of hoisting, rigging, crane operations, critical lifts, and lift-director responsibilities.
This is not an entry-level or general Safety Professional position. Candidates must meet all mandatory experience requirements to be considered.
The selected professional will perform the full responsibilities of a site Safety Professional, including field safety inspections, hazard identification, JHA/JSA review, regulatory compliance, incident prevention and investigation, corrective actions, toolbox talks, documentation, and coordination with field supervision. In addition, this individual will provide specialized oversight of lifting and rigging activities and must demonstrate the technical knowledge and field experience required to serve as a qualified Lift Director.
Candidates must meet ALL of the following requirements:
In addition to Lift Director responsibilities, the selected professional will be expected to conduct routine and high-risk activity inspections, identify and correct unsafe conditions, review JHAs/JSAs and pre-task plans, monitor PPE and fall-protection compliance, participate in incident and near-miss investigations, document corrective actions, conduct safety meetings and toolbox talks, and maintain compliance with project-specific safety requirements.
BCSP credentials such as CSP, ASP, CHST, OHST, or SMS are strongly preferred. Additional NCCCO/NCCER or equivalent credentials related to Lift Director, Rigger, Signal Person, crane operations, or hoisting and rigging are highly desirable.
This is a well-compensated opportunity supporting a major data center construction project. Meals are provided on site. Per diem may also be available for qualifying assignments/candidates, depending on project requirements and assignment conditions.
Qualified candidates should be prepared to provide documentation verifying their safety, hoisting, rigging, Lift Director, and data center experience.
Please do not apply unless you meet the mandatory 10-year hoisting/rigging experience requirement, have at least 3 years of Lift Director experience, and have previous data center construction experience.