Responsible for the development of junior level schedulers on the following: preparing and analyzing metric reports; preparing and analyzing schedule risk; developing what-if schedules to address various scenarios and options as necessary; crashing scope of work schedule durations; following processes and handbook procedures; and all aspects of scheduling within the assigned systems and software. Provide input and guidance to schedulers in the development of fully integrated system schedules (including resource loading and leveling) for schedules that utilize critical path methodology based on work scope from the work packages and planners work list.