| Location | NY |
| Salary | $131,000–$188,000 Per Year |
Professional Engineer - Electrical Engineering in Merced, CA for Merced Irrigation District Return to Search Results
Expand Show Other Jobs
Job Saved Save Job
Professional Engineer - Electrical Engineering
Merced Irrigation District
Facebook X LinkedIn Share
APPLY NOW
Application
First Name
Last Name
Email address
Message To Employer (required)
Please attach your resume and up to two additional documents.
Files must be 2MB or less and acceptable file types.
Add File
Captcha / Bot check:
Copy from here
...to here
Click to hear these letters.
What is this?
APPLY NOW
The application opened in a new tab.
You may close this popup.
By using this feature you agree to our Terms and Conditions and Privacy Policy.
Details
Posted: 08-Oct-26
Location: Merced, California
Salary: $131,000 to $188,000
Required Education: 4 Year Degree
Years of Experience: 2 - 4
Type:
Full Time
Level:
Experienced
Position Overview
The Professional Engineer - Energy Resources performs advanced electrical, mechanical, and computer modeling engineering tasks to support Merced Irrigation District's (MID) electric and hydroelectric operations. This role collaborates across departments, including General Management, Water Operations, Maintenance, and Finance, to ensure safe, efficient, and compliant energy resource management. The position involves project management, system analysis, regulatory compliance, and stakeholder engagement to achieve District objectives.
Key Responsibilities
Skills and Abilities
Knowledge
Work Environment & Environmental Factors
Physical Demands
Mental Demands:
Supervision:
Qualifications
Education
Experience
Skills and Abilities
Knowledge
Special Requirements
Create a Job Match for Similar Jobs
About Merced Irrigation District
Water, Power and MoreMerced Irrigation District owns, operates and maintains the New Exchequer and McSwain dams, reservoirs, and hydroelectric facilities. These are MID's primary water storage facilities on the Merced River. They are located in the foothills on the western slope of the Sierra Nevada mountain range, approximately 23 miles northeast of Merced. The two dams and reservoirs are integral parts of the 1964 Merced River Development Project and are licensed by the Federal Energy Regulatory Commission (FERC). Lake McClure (New Exchequer Reservoir) has a storage capacity of about 1,025,000 acre feet, while Lake McSwain (McSwain Reservoir) has a storage capacity of 9,730 acre feet. The New Exchequer Dam project was completed in 1967 as a multi-purpose effort: Lake McClure provides irrigation and domestic water supply, flood control, hydroelectric power generation, recreation and support for environmental stewardship. MID produces up to 107 megawatts of emission-free electricity at its Exchequer, McSwain and Merced Falls hydroelectric facilities. The district's water system diverts water from the Merced River at two locations below Lake McClure. The Northside Canal diversion se...rves acreage north of the river. The Main Canal diversion is located 3 miles downstream of McSwain Dam and serves acreage south of the Merced River.MID's boundaries encompass 164,000 gross acres. Of that, 132,000 acres are irrigable. Of that, approximately 100,000 acres receive water from MID. The total distribution system of MID spans 862 miles. It is comprised of natural waterways, unlined and lined canals, sloughs and pipelines. MID also maintains 215 wells in support of its conjunctive management activities for groundwater and surface water. MID's irrigation distribution system supports local flood control by routing foothill-stream runoff away from populated areas. MID formed the Merced Irrigation District Drainage Improvement District #1 (MIDDID#1) in 1994. Several residential, commercial, industrial, and government parcels received drainage service from the district.MID owns, operates and maintains five recreation areas adjacent to lakes Mc lure and McSwain. While the Lake McSwain Recreation Area is located adjacent to Lake McSwain, McClure Point, Barrett Cove, Horseshoe Bend and Bagby Recreation Areas are all located adjacent to Lake McClure. A total of six boat launch facilities are available in the Parks system. More than 600 campsites are available year-round. Floating marinas are located on Lake McSwain and in two locations on Lake McClure. Recreational activities enjoyed in the recreation areas include fishing, boating, swimming, camping, hiking and bicycling.MID is authorized to act as an electric utility under the California Water Code. The district has owned and operated hydroelectric generating facilities on the Merced River since 1927. In 1996, MID exercised its authority to sell power to retail electric customers. Since then, MID has connected more than 12,600 customers to the electric system.
Show more
Show less
Connections working at Merced Irrigation District
https://careers.awra.org/jobs/22642938/professional-engineer-electrical-engineering
Return to Search Results
Loading. Please wait.
Error
Close
Continue
You do not have JavaScript Enabled on this browser. Please enable it in order to use the full functionality of our website.
Copyright 2026 American Water Resources Association.
Copy link
Thanks for sharing!
Find any service
AddToAny
More…
Cookie Settings Got it
We use cookies so that we can remember you and understand how you use our site. If you do not agree with our use of cookies, please change the current settings found in our Cookie Policy. Otherwise, you agree to the use of the cookies as they are currently set.