Mission-Critical EHS Specialist (Data Center Construction)

Excel Inc.

  • Fairless Hills, PA
  • 2 days ago

    Highlights

    Excel Staffing partners with leaders across Oil & Gas, Petrochemical, Construction, Data Centers, Executive, HR, IT/Software, Finance & Accounting, Hospitality, Warehouse & Logistics, and more. Candidates interested in the Berwick, Pennsylvania opportunity should meet one of the following: Bachelor’s in Environmental Health & Safety plus 3 years of full-time construction safety management experience; or.

    Numbers & Facts

    LocationFairless Hills, PA

    Description

    Mission-Critical EHS Specialist (Data Center Construction)

    Location: Fairless Hills, PA (onsite) | Term: 12-month 1099 contract | Start: Immediate

    Compensation: $50–$52/hour (1099) + $500 weekly housing allowance if you reside more than 75 miles from site.

    About Excel Staffing

    Excel Staffing partners with leaders across Oil & Gas, Petrochemical, Construction, Data Centers, Executive, HR, IT/Software, Finance & Accounting, Hospitality, Warehouse & Logistics, and more. Whether you need long-term, short-term, payroll, project-based, or permanent talent, we scale solutions rapidly to match client demand.

    A day in the life

    • Serve as the owner’s representative and the on-the-ground “eyes and ears” for a mission-critical construction site.
    • Coach craft and supervision to build safety ownership—be a Safety Coach, not a Safety Cop.
    • Lead hazard identification and risk assessments; review safe work method statements and JSAs.
    • Oversee high-voltage work practices, ensuring compliance with NFPA 70E and effective Lockout/Tagout (LOTO).
    • Conduct incident investigations and post-event root cause analyses; drive corrective actions.
    • Maintain EHS management system elements aligned to ISO 45001/OHSAS 18001 and regional regulations.
    • Produce clear daily documentation and weekly timesheets using digital tools; issue concise reports to the Owner/Client and the GC.
    • Be onsite Monday–Friday for 8-hour shifts; no weekend work anticipated.

    What you bring

    • Mission-critical experience is required, with 7+ years in data center construction.
    • Bachelor’s degree in Health & Safety preferred; alternatively, 10+ years of construction safety experience if you do not have a degree and/or data center background.
    • High-voltage exposure preferred; NFPA 70E knowledge required.
    • OSHA 500/510 required; BCSP CHST preferred.
    • Fluency in the local language and strong proficiency in English.
    • In-depth understanding of regional H&S regulations and competency with ISO 45001 / OHSAS 18001 systems.
    • Proven strength in risk assessment, method statements, and post-incident root cause analysis.
    • Exceptional written and verbal communication with Owners/Clients and General Contractors.

    Berwick, PA role – additional criteria

    Candidates interested in the Berwick, Pennsylvania opportunity should meet one of the following:

    • Bachelor’s in Environmental Health & Safety plus 3 years of full-time construction safety management experience; or
    • A nationally recognized safety credential (e.g., US: CSP, CIH, ASP, CHST; Canada: CRSP, CCOHS) and 5 years of full-time construction safety management; or
    • In the US, a current OSHA 500 (or Canadian equivalent) and 6 years of full-time construction safety management.

    Schedule and locations

    • Work hours: Monday–Friday, 8 hours/day, 40 hours/week; no weekends.
    • Primary opening: Fairless Hills, PA (onsite).
    • We’re also hiring for similar roles in: Manassas, VA; Sterling, VA; Roanoke, VA; Las Vegas, NV; Jackson, GA; Lithia Springs, GA; Grand Rapids, MI; Berwick, PA.

    You should be proficient in

    • Workplace Safety & EHS Management
    • Lockout/Tagout (LOTO)

    How to apply

    Contact: Stephen Torrez, Business Development Manager
    www.excelstaffing.net

    Stephen.Torrez@ExcelStaffing.net

    Similar Jobs

    See more jobs