Integrated Master Schedule and Earned Value Management System (IMS/EVMS) Surveillance Support Specialist

Solvere Technical Group

Mobile, AL

JOB DETAILS
SKILLS
Accounting, American National Standards Institute (ANSI), Analysis Skills, Auditing, CPR Certification, Construction, Contract Requirements, Contract Review, Control Systems, Corrective Action, Cost Reporting, Defense Contract Audit Agency (DCAA), Earned Value Management (EVM), Equal Employment Opportunity (EEO), Financial Analysis, IP Multimedia System (IMS), Microsoft Excel, Microsoft Office, Microsoft PowerPoint, Microsoft Project, Microsoft SharePoint, Microsoft Word, Power BI, Primavera, Program Planning, Progress Reports, Project Schedule, Reporting Skills, Risk Management, Surveillance, Systems Analysis, Time Management, United States Coast Guard (USCG), Variance Analysis, Work Breakdown Structure (WBS)
LOCATION
Mobile, AL
POSTED
30+ days ago

Solvere Technical Group is actively seeking a qualified Integrated Master Schedule and Earned Value Management System (IMS/EVMS) Surveillance Support Specialist candidate for an upcoming U.S. Coast Guard opportunity. This position is contingent on award.

SPECIFIC DUTIES & RESPONSIBILITIES:

  • Plan, organize, and conduct EVMS surveillance activities to ensure the shipbuilder's management control system complies with EVMS guidelines and provide timely indications of actual and potential problems.
  • Conduct detailed analysis of the Shipbuilder's IMS for all OPCs; determine compliance with OPC Production Contract/CLIN requirements, DCMA standards, and ANSI-EIA 748 guidelines.
  • Maintain OPC physical progressing model using Microsoft Project, SharePoint, and Power BI; audit shipbuilder reported physical progress as directed by the PMR.
  • Assist in validating Shipbuilder EVM variance reports (CPR, CFSR, CCDR, IMS); reconcile reports and assess system health.
  • Assist in determining PMB compliance and EAC analysis; review Contractor external cost and schedule reports.
  • Identify and analyze schedule conflicts or delays; propose resolutions and provide input to risk management activities.
  • Develop and provide comprehensive EVM/IMS reports and presentations detailing findings, risks, and recommended corrective actions.
  • Create and update the USCG OPC PRO program plan annually utilizing Primavera or MS Project, including WBS, work packages, task books, and time-phased costs.
  • Conduct production surveillance in Shipbuilder facilities and onboard OPCs under construction; conduct CDRL review and generate contract correspondence.
  • Prepare scheduling materials (Gantt Charts, Milestone Charts) and attend meetings; provide EVM and IMS status presentations.

REQUIRED KNOWLEDGE, SKILLS, AND ABILITIES

  • Comprehensive knowledge of shipbuilding processes.
  • Proficiency in MS Project and Primavera scheduling software.
  • Ability to produce EVM reports, briefs, and presentations.
  • Knowledge of economic, statistical, accounting, and financial analysis principles and techniques.
  • Familiarity with DCMA standards and ANSI-EIA 748 guidelines.
  • Knowledge of DCMA and DCAA auditing organizations and the overall acquisition process.
  • Knowledge of Microsoft Office suite including Word, PowerPoint, Power BI, and Excel.
  • Physical ability to walk through an active shipyard and OPCs under construction.

EDUCATION, CERTIFICATION AND EXPERIENCE:

  • Bachelor's degree in an engineering or related technical/business field required or Five (5) or more additional years of relevant experience, or EVM certification (EVMP or EVMD/EVMO).

  • Minimum of five (5) years of experience supporting project management and shipbuilding processes required.

WORK LOCATION:

  • Mobile, AL

SECURITY:

  • Secret level security clearance required.
  • Non-Disclosure Agreement (NDA) required.

BENEFITS

Solvere offers a comprehensive and generous benefits package. The Solvere benefits package includes medical, dental, and vision insurance for the employee and/or families. Solvere also includes basic life insurance plus short- and long-term disability for the employee. Employees may elect to enroll in our company’s 401k plan. Employees will also accrue paid time off and holidays. Additional voluntary options include supplemental insurance plans.

About the Company Visit: www.solveretechnical.com

Solvere Technical Group is committed to non-discrimination and equal employment opportunity. All qualified applicants will receive consideration for employment without discrimination based on disability, protected veteran status or any other characteristics protected by law.

About the Company

S

Solvere Technical Group