Update all drawings and engineering docs while on site to correct location records, drawings, bill of materials (BOM), installation notes, and memos to reflect additions and modifications to customers' location (central office) as a result of installation or engineering activities. Use results to determine accuracy of floor plan layouts, power distribution, backup power supplies, and cabling of central office equipment.