Construction Scheduler

Embark Recruiting Solutions

  • Columbus, Ohio
  • 30+ days ago

    Highlights

    Experience developing detailed resource loaded design and construction schedules, and preparing progress/status reports and performance of earned value analysis. Critical Path Method (CPM) scheduling knowledge/experience and the ability to analyze schedules to determine duration and logic issues.

    Numbers & Facts

    LocationColumbus, Ohio

    Description

    Title: Construction Scheduler

    Location: Columbus, OH

    Duration: Direct Hire

    Our client, located in Columbus OH, has an immediate need for a Scheduler. This is a direct hire / full time position. Details are as follows:

    • The scheduler shall have an in-depth knowledge of construction practices and sequencing
    • The construction scheduler shall review construction schedules with supporting documentation and provide reports to project team
    • Analyze scheduling scenarios to assist the project team
    • The scheduler shall demonstrate the ability to prepare a Critical Path Schedule (CPM)
    • Assist the Project Team in evaluating and monitoring the Contractors progress schedule as well as consulting and troubleshooting issues throughout the construction of the project
    • The scheduler shall have excellent computer skills with in-depth knowledge of Primavera P6 scheduling software and Microsoft Project.
    • Ability to utilize Microsoft Office products, specifically Word and Excel will be required

    Experience:

    • Must have a minimum of 3-5 years’ scheduling experience
    • BS degree in Civil Engineering or Building/Construction Management is preferred
    • Strong background using Primavera P6 scheduling software
    • Experience with construction schedules for the design-build phase of the projects
    • Critical Path Method (CPM) scheduling knowledge/experience and the ability to analyze schedules to determine duration and logic issues
    • Experience developing detailed resource loaded design and construction schedules, and preparing progress/status reports and performance of earned value analysis
    • Experience with time impact analysis
    • Construction claims and change order experience is preferred
    • Construction scheduler should have experience integrating the construction schedule into the master schedule
    • Candidate must be able to demonstrate excellent verbal and written communications skills
    • The scheduler shall have excellent computer skills with in-depth knowledge of Primavera P6 scheduling software and Microsoft Project.
    • Ability to utilize Microsoft Office products, specifically Word and Excel will be required

    Similar Jobs