Activities include but are not limited to: Verifying systems are installed per design, confirming design operational feasibility, recording as-built engineering changes on drawings, ensuring proper setup and testing of equipment as per supplier requirements. Verification that plant equipment is in compliance with project contract and specification requirements, conforms to design operational feasibility, and is set up and tested per the supplier's requirements, within the engineer's discipline capacity.