Bath Iron Works Corp logo

Sr. / Principal Platform Engineer, Planning Yard (Norfolk, VA)

Bath Iron Works Corp

  • Norfolk, VA
  • 7 days ago

    Highlights

    Quality Management: Provide technical support to Design for Ship Installation Drawing (SID) package development for Ship Alterations and Post Shakedown Availability (PSA) Work Items tasked to Planning Yard. Team Collaboration and Communication: Interface with NAVSEA, ISEAs, and other contractors as required in seeking engineering solutions.

    Numbers & Facts

    LocationNorfolk, VA
    IndustryAerospace and Defense
    Company Size10,000 employees or more
    Year Founded1826
    Websitehttps://www.gdbiw.com/

    Description

    Job Description

    Operating under the BIW Business Operating System (BOS), the Platform Engineer ensures compliance with safety, quality, and performance standards while coordinating with other key stakeholders to meet overall milestones.

    Key Responsibilities

    Safety Leadership:

    • Take personal responsibility for your own safety through hazard identification and mitigation.
    • Ensure practices/processes are safely executed.
    • Communicate safety concerns and model safe behaviors.

    Project Execution:

    • Provide on-site representation for the DDG 51 Class PY Engineering team in Norfolk, VA.
    • Interface with the Navy, Navy Contractors, BIW Design, and BIW management.
    • Support Design in the resolution of waterfront Engineering issues that may arise during installation of Ship Alterations.
    • Develop and process Ship Alteration Technical Data in accordance with schedule constraints and governing requirements.

    Quality Management:

    • Provide technical support to Design for Ship Installation Drawing (SID) package development for Ship Alterations and Post Shakedown Availability (PSA) Work Items tasked to Planning Yard.
    • Accompany and assist shipcheck teams to ensure TDR guidance is followed and requirements are fulfilled.

    Team Collaboration and Communication:

    • Interface with NAVSEA, ISEAs, and other contractors as required in seeking engineering solutions.
    • Participate in off-site meetings and other events as needed.
    • Participate in special projects and lead technical meetings as assigned.

    Occasional travel is required.

    This is a year round position that reports to the HM&E Engineering Team Lead in Maine.

    Required/Preferred Education/Training

    • Bachelor''s Degree in an Engineering discipline

    Required/Preferred Experience

    • Familiarity with DDG 51 class construction and documentation required.
    • Experience in a marine repair environment preferred.
    • Project Management experience preferred.
    • Must have the flexibility to work in a fast-paced environment under the pressure of changing and often conflicting priorities.
    • Ability to multi-task and manage simultaneous projects required.
    • Strong research skills and attention to detail required.
    • Self-motivation, strong work ethic, and the ability to work independently required.
    • Ability to work effectively in a team environment with varying personalities required.
    • Competence in MS Office products and general PC skills required.
    • Strong oral and written communication skills required.

    This position requires you to be able to obtain a government security clearance. You must be a US Citizen for consideration and you must be able to obtain an interim security clearance within the first 45 days of hire. For more information regarding the security clearance process, please visit Investigations & Clearance Process (dcsa.mil).

    About Company

    Shipbuilding has been a way of life along the Kennebec River in Bath, Maine, since 1762, when the sailing ship Earl of Bute was launched on the site of present day Bath. The Bath Iron Works (BIW) shipyard, located on the west bank of the Kennebec, just south of downtown Bath, is the namesake of an iron foundry established in 1826.

    Brevet General Thomas W. Hyde, US Army (Ret) took over the foundry in 1865, following service with the 20th Maine Regiment during the Civil War. Nearly two decades later, he incorporated his diversified marine business interests as Bath Iron Works, Limited in 1884, before expanding into shipbuilding with the acquisition of the Goss Marine Iron Works in 1888.The first BIW-built vessel was a coastal passenger ship named Cottage City built for the Maine Steamship Co. Since the completion of Hull #1 in 1890, BIW has been awarded more than 425 shipbuilding contracts, including 245 military ships (mostly destroyers and frigates for the US Navy) and over 160 private yachts and commercial vessels. BIW became a wholly-owned subsidiary of General Dynamics in September 1995.

    In terms of modern US Navy surface combatant programs -- ones where BIW ships are still in service -- the Lead Ship construction contract for the Oliver Hazard Perry (FFG 7) Class of guided missile frigates was awarded to BIW in 1973, and 24 of these surface combatants were delivered over the next 15 years.

    In 1982, the Navy selected BIW as second-source shipbuilder for the Ticonderoga (CG 47) Class of AEGIS guided missile cruisers. The company went on to win contracts for eight of these warships, delivering the final one in 1993. In 1985 BIW won the competition for detail design and construction of USS Arleigh Burke (DDG 51) , the Lead Ship for the Navy's newest, most capable class of AEGIS guided missile destroyers. BIW has delivered the lead ship and 30 follow ships, with delivery of the final follow ship under the most recent contract expected in 2011. The US Navy has announced that it will acquire further Arleigh Burke class vessels during the next decade.

    Under General Dynamics' ownership, BIW solidified its industry leadership position by teaming with the City of Bath and the State of Maine to support a long-term capital investment plan. With the first phase of modernization completed in 2001, BIW began building ships in its new state-of-the-art facility. These improvements ($320 million so far) enable the company to offer unprecedented productivity, quality and affordability to our customer. Further applications of lean manufacturing techniques and advanced modular construction are planned, and the yard has switched to 3D computer-aided design for its latest ships. BIW is building the first of the DDG 1000 class of destroyers, Zumwalt, using these advanced technologies.

    BIW is a yard with a history, and a bright future. Throughout Navy circles - and especially with their current and former crews - it's generally recognized that 'Bath Built Is Best Built' a phrase first heard in the early 1900s, and every bit as true today as when it was first said.

    Similar Jobs