Semper Valens Solutions seeks a Sr Maintenance Engineer to manage and maintain program schedules at Aberdeen Proving Ground, MD. The role requires a Secret clearance and is contingent upon contract award.Responsibilities include critical path analysis, schedule risk assessment, and evaluating scheduling tools for software and hardware programs. A minimum of ten years in Maintenance Engineering with a engineering degree is required.#J-18808-Ljbffr