
Hydraulic Systems Engineer Jobot
- $85,000–$120,000 Per Hour
| Location | Cincinnati, OH |
Salas O'Brien / Process Plus is a full-service engineering firm that provides
Commissioning and Qualification / Validation (C&Q) services to the food, pharmaceutical and biotech
industries. Validation Specialists develop and execute C&Q protocols (e.g., IQ/OQ/PQ) for these
industries. Protocols may include verification of manufacturing / packaging facilities, process and
packaging equipment, control systems, utilities, and HVAC / environmental conditions. Commissioning is executed to document delivery of a safe, functional system per Good Engineering Practices (GEP) and
qualification is executed to verify conformance to the FDA's current Good Manufacturing Practices
(cGMPs).
ESSENTIAL JOB FUNCTIONS: The responsibilities listed are fundamental to the position and must be
performed successfully to achieve the key performance objectives of the role. Other responsibilities may
be assigned.
efforts.
intent, and strategy.
construction contractors to develop and execute commissioning protocols and checklists.
includes compiling and analyzing qualification / validation data.
Requirements / Functional Specifications / Design Specifications) and field verifications
(IQ/OQ/PQ).
JOB REQUIREMENTS: A Lead Validation Specialist (VS-III or VS-IV) is organized, analytical, and self-motivated, possessing considerable knowledge of the food, pharmaceutical, and biotech industries and
FDA regulations.
including communication with the customer (e.g. status updates for schedule, progress and cost)
(DM) administratively and the Project Manager (PM) for the successful execution of the project.
This job description is intended to describe the general nature, complexity and level of work to be performed by employees assigned to this position and is not construed as an exhaustive list of responsibilities, duties and/or skills required. It does not prescribe or restrict the work that may be assigned and is subject to change at the discretion of the company.
Additionally, a VS-III or VS-IV:
wiring diagrams, P&ID's, HVAC / mechanical system drawings, and architectural layouts.
measuring instrumentation used to gather verification data.


