Brief Description of Job Duties:
Under limited supervision, perform standard drafting assignments based on work orders provided. Make adjustments in drawings or specifications. Prepare working plans, detailed drawings, and complete mechanical or electrical drawings for components and assemblies. Works from notes, verbal instructions, and rough or detailed sketches for engineering or manufacturing purposes. Verify completed work and check dimensions, materials to be used, and quantities.
Primary duties include, but are not limited to:
JOB REQUIREMENTS
The applicant MUST have the following qualifications:
Mental Qualifications:
Physical Qualifications:
Additional Desirable Experience:
Please note this job description is not designed to cover or contain a comprehensive listing of activities, duties or responsibilities that are required of the employee for this job. Duties, responsibilities, and activities may change at any time with or without notice.
Placement in pay range depends on: years of relevant CAD drafting experience, 3D drafting tools experience, any of the additional desirable experiences such as knowledge of IPC standards, etc.
Compensation details: 0 Yearly Salary
PIcb164f37806f-9616