BIM Project Coordinator- Data Center Construction

Broadstaff

Fredricksburg, VA(remote)

JOB DETAILS
SKILLS
Communication Skills, Construction, Electricity, Fire Alarm, HVAC, Leadership, Low Voltage (LV), Mechanical, Electrical and Plumbing (MEP), Network Operations Center, Organizational Skills, Plumbing, Project Lifecycle, Project/Program Coordination, Team Player, Willing to Travel
LOCATION
Fredricksburg, VA
POSTED
30+ days ago

BIM Coordinator (Data Center | Div 27/28)
Location: Remote (East Coast Preferred) | Occasional Travel to VA/Regional Sites
Company: Broadstaff

Broadstaff is recruiting for a leading low-voltage integrator expanding its data center construction division. We are seeking a BIM Coordinator to support Division 27 (Communications) and Division 28 (Electronic Safety & Security) scopes on a large-scale, multi-year data center program.

This is a high-impact coordination role, working closely with internal teams, clients, and trade partners to ensure accurate, clash-free design and execution.

Key Responsibilities

  • Coordinate BIM/VDC efforts across Div 27 & 28 systems

  • Manage clash detection and coordination with MEP trades (electrical, HVAC, plumbing)

  • Produce and maintain installation-ready drawings and models

  • Collaborate with project teams, clients, and field personnel

  • Support RFIs and resolve design conflicts

  • Maintain model accuracy throughout project lifecycle

Scope Includes
Division 27 (Communications):

  • Structured cabling (fiber & copper)

  • Cable tray and pathway systems

  • IDF/MDF layouts and rack elevations

Division 28 (Security):

  • Access control systems

  • CCTV systems

  • Fire alarm coordination (as required)

Requirements

  • 3–7+ years of BIM/VDC coordination experience in construction

  • Experience coordinating across multiple trades (MEP environment)

  • Familiarity with low-voltage systems (Div 27/28 preferred)

  • Proficiency in Revit, Navisworks, BIM 360 / ACC

  • Strong communication and coordination skills

Role Details

  • Primarily remote (minimal on-site requirement)

  • Occasional travel to project sites as needed

  • Reports into project leadership / on-site PM

  • Compensation: ~$120K–$140K range (flexible based on experience)

Why This Role

  • Long-term, multi-year data center program

  • High-visibility role supporting major builds

  • Stable, direct-hire opportunity with growth potential

 

About the Company

B

Broadstaff